Brevard Railroad Ave Greenway Extension

Description

The Brevard Railroad Avenue Greenway Extension project included the construction of approximately 2,000 linear feet of new 10-foot-wide asphalt bike path designed to improve pedestrian and bicycle connectivity throughout the corridor. The project also featured the installation of a 10’ x 80’ prefabricated steel bridge with a reinforced concrete deck, providing a durable and long-lasting crossing solution within the greenway system.

Our scope of work included site grading, stormwater infrastructure installation, pathway construction, bridge installation, and roadway and trail signage. Careful coordination and quality workmanship were required to complete the project while maintaining accessibility and minimizing impacts to the surrounding area. The finished greenway provides a safe, functional, and visually appealing recreational asset for the community.